Help with your Raleigh HOA and city permit approvals

A Raleigh deck, fence, or ADU can need two sign-offs: your HOA’s architectural approval and a permit from the City of Raleigh’s Planning and Development department. Share your Raleigh project details and we’ll be in touch.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.

Raleigh permits for fences, decks, sheds, solar, and ADUs

The City of Raleigh’s Planning and Development department handles residential permits through its Permit and Development Portal. Its residential permit guide lists a zoning permit as required when installing a fence. If your home is in a historic district or is a landmark, you’ll submit a Certificate of Appropriateness to the Raleigh Historic Development Commission. Properties served by a private well or septic system need approval from Wake County Septic and Wastewater Management before applying with the city. HOA rules are separate — the city’s ADU FAQ tells owners to ask their HOA whether ADUs are permissible and whether there are added design requirements.

City of Raleigh Planning and Development — How to Get a Residential Permit

  • Fences

    Raleigh’s UDO § 7.2.8 lets a wall or fence up to 6 and one half feet tall stand in a front or side street setback, outside IH districts, as long as the portion above 4 feet is no more than 50% opaque. In a side or rear setback the limit is 8 feet, dropping to 6 and one half feet when the setback is adjacent to a street. Chain-link fences aren’t allowed in any front or side street setback except in IH districts.

    Source: Raleigh UDO § 7.2.8: Walls and Fences

  • Decks and porches

    The city’s outdoor permit checklist says a building permit is required to install a screened porch, deck, balcony, sunroom, or similar structure. The application must include a residential permit form, certified survey, site plan, and structural elevations. Properties with septic systems or in historic zones might need additional approvals.

    Source: City of Raleigh: Warm Weather Projects — Your Outdoor Permit Checklist

  • Sheds and accessory structures

    Raleigh’s accessory structures page says a permit is required regardless of size. A structure under 12 feet in any direction — length, width, or height — gets a zoning permit. One that exceeds 12 feet in any direction needs a building permit.

    Source: City of Raleigh: Accessory Structures and Additions

  • ADUs

    Under UDO § 2.6.3, an ADU’s gross floor area must be less than the main dwelling’s and is capped at 1,000 square feet on lots over 40,000 square feet, or 800 square feet on smaller lots. Only one ADU is allowed per lot unless the lot is in a Frequent Transit Area, where up to two are allowed. A detached ADU must sit at or behind the front wall of the house, can be up to 26 feet tall, and isn’t permitted on a flag lot. An ADU’s ownership can’t be transferred apart from the main home.

    Source: Raleigh UDO § 2.6.3: Accessory Dwelling

  • Solar

    The city’s solar PV page says most residential one- and two-family rooftop systems are eligible for same-day online permitting through the Permit Portal. A zoning permit isn’t required for a roof-mounted system that stays within the height the UDO allows, and rooftop systems can exceed the district’s maximum building height by up to 12 feet under UDO § 1.5.7.D.2.g. Ground-mounted systems need a site plan; single-family rooftop projects don’t.

    Source: City of Raleigh: Residential Solar Photovoltaic (PV) System

Review times (as of October 2026)

Planning and Development publishes review benchmarks in business days. A first review takes 3 for decks, porches, pools, and spas; 7 for additions and accessory structures; 10 for a new single-family home, duplex, or townhouse; and 3 for residential fence zoning permits. Additional reviews run 3, 5, 5, and 3 days respectively, and intake through the portal is listed at 3–5 business days. The city calls these goals, not guaranteed turnaround times (checked October 2026). Source: City of Raleigh: Review Turnaround Times and Performance Dashboards.

North Carolina HOA rules that matter for Raleigh homeowners

For Raleigh neighborhoods organized as planned communities, the governing statute is generally Chapter 47F of the North Carolina General Statutes — the Planned Community Act. Section 47F-1-102 makes it apply from January 1, 1999 onward, leaving out communities of 20 lots or fewer that haven’t opted in and those restricted to nonresidential use. Certain sections, records access among them, also bind pre-1999 communities unless their governing documents expressly opt out. Rooftop solar is addressed outside Chapter 47F, in N.C.G.S. § 22B-20.

  • N.C.G.S. § 22B-20 lets a covenant regulate where solar collectors are located or how they’re screened — but only if it doesn’t have the effect of preventing their reasonable use on a residential property. A covenant that prohibits them outright is generally void. In a lawsuit under the section, the court may award costs and reasonable attorneys’ fees to the prevailing party. Source: N.C.G.S. § 22B-20 (Solar collectors).
  • Section 47F-3-118 says the association’s financial and other records, including records of board and association meetings, must be reasonably available for examination by any lot owner. The annual income and expense statement and balance sheet must be made available to all owners at no charge within 75 days after the fiscal year closes. Source: N.C.G.S. § 47F-3-118 (Association records).
  • During a severe, extreme, or exceptional drought designated by the U.S. Drought Monitor or the state, when government water conservation measures are in place, § 47F-3-122 says a covenant requiring you to irrigate landscaping generally can’t be construed to require watering. The statute defines landscaping to include lawns, trees, shrubbery, and other ornamental or decorative plants, and it has exceptions tied to specific covenant wording. Source: N.C.G.S. § 47F-3-122 (Irrigation of landscaping).

Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.

Raleigh HOA and permit FAQ

Do I need a permit for a fence in Raleigh?

Yes. Raleigh’s residential permit guide says a zoning permit is required when installing a fence, and the fence has to meet the height, opacity, and chain-link limits in UDO § 7.2.8.

Does a small shed need a permit in Raleigh?

It does — the city requires a permit for an accessory structure of any size. If it stays under 12 feet in every direction, that’s a zoning permit; past 12 feet in any direction, it’s a building permit.

Can I build an ADU in a Raleigh HOA neighborhood?

The city’s ADU FAQ says “maybe” and suggests asking your HOA whether ADUs are allowed and whether it has extra design requirements. On the city side, UDO § 2.6.3 caps an ADU at 1,000 or 800 square feet depending on lot size.

Do rooftop solar panels need a zoning permit in Raleigh?

Not if the system stays within the height the UDO allows, according to the city’s solar PV page. Most one- and two-family rooftop systems can get same-day online permitting through the Permit Portal.

Get help with your Raleigh project

Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.