For homeowners planning a deck, fence, solar, or ADU — we prepare both approvals, file everything, and track it to approved.
Permits cause 31% of home project delays — and 82% of new homes sold now sit behind an HOA gate.
Two approval gauntlets. Zero straight answers.
Your HOA’s architectural committee meets once a month, wants forms you’ve never heard of, and can move the goalposts after you submit.
The city wants drawings your contractor’s quote doesn’t include — and the review queue runs 2 to 5 months in slow metros.
One rejected submission restarts the clock. Reviewer comments read like riddles, and nobody tells you what “revise and resubmit” actually means.
So your project sits. Your contractor moves on to the next job, prices creep up, and the season you planned to build in slips away.
One case. Both approvals. Flat price.
1
Step 1 — Tell us your project.
Enter your address, project type, and photos or your contractor’s quote. You get a free 2-page Approval Report listing everything your HOA and your city will require — including what would get you rejected.
2
Step 2 — We prepare and file.
A permit specialist, backed by AI tooling, writes your ARC packet, assembles the city permit application, and submits both.
3
Step 3 — We handle revisions until it’s approved.
When a reviewer comes back with comments, we translate them, fix the documents, and resubmit. You get a status ping at every stage.
Here’s the exact report a Gilbert, AZ homeowner gets for a backyard deck — before paying anything.
280 sq ft attached composite deck · single-family home in an HOA community · Gilbert, AZ · contractor quote attached.
SAMPLE
APPROVAL REPORT — 280 sq ft attached composite deck
WHAT YOUR HOA WILL REQUIRE (Architectural Review)
ARC application via your management company’s portal
Site plan showing deck footprint and distance to rear/side lot lines
Elevation drawing showing deck height and railing style
Material and color spec sheet (composite brand + color sample)
Signatures from the two adjacent neighbors
Timeline: committee meets monthly — plan on 2 to 6 weeks
WHAT THE CITY WILL REQUIRE (Gilbert, AZ)
Residential permit application (any attached deck over 30" above grade)
Framing plan, footing detail, and ledger attachment detail
Site plan with lot lines and setbacks
Permit fee: roughly $250–$400
Timeline: 2 to 4 weeks first review; each revision cycle adds 1 to 2 weeks
YOUR GAP LIST — fix these before you submit
Your contractor’s quote has no ledger attachment detail — the city will reject the drawings
Quoted railing height is 34" — city minimum is 36"
HOA requires neighbor signatures your contractor didn’t mention
What you get
Know before you spend
The free report tells you every requirement and red flag before you commit a dollar.
One flat price
$1,497 covers packet prep, filing, and every revision cycle. No hourly meters.
Both approvals, one case
HOA and city handled together, so neither one blindsides the other.
Reviewer comments, decoded
We translate “revise per code section 507.2” into plain English and fix it for you.
Your build stays on schedule
Fewer rejection cycles means your contractor starts when they said they would.
Status without chasing
You see exactly where your case is: prepared, submitted, in revision, approved.
Pricing
Approval Report
Free
Best for: homeowners still deciding if a project is worth the hassle.
2-page report: every HOA and city requirement for your project
Gap list of what would get you rejected
Fee and timeline estimates for your jurisdiction
Recommended
Core Approval
$1,497 flat
Best for: decks, fences, solar, and ADUs that need both approvals.
Full ARC packet written and submitted to your HOA
City permit application prepared and filed
All revision cycles and reviewer responses included
Status tracking from submission to approved
Contractor Plan
$799/mo
Best for: solar, roofing, pool, and deck contractors losing deals to the HOA black hole.
Up to 4 HOA/permit submissions per month
Status dashboard across all your client projects
Priority turnaround on revisions
Cancel any month
FAQ
Is this available yet?
Not yet — we’re opening in one HOA-heavy metro first, with founding users getting first access. Sign up and you’ll get a free Approval Report for your address when we open your area, before anyone else.
Why wouldn’t I just file it myself?
For a shed or a short fence, you should — self-filing works for simple projects. But medium projects fail on details: a missing ledger drawing or a 34-inch railing restarts a multi-week review clock every time. We exist for the projects where one rejection costs you a month.
$1,497 feels like a lot.
Local permit expediters charge $500 to $2,500 — and they only handle the city side. Our price covers the HOA packet, the city permit, and every revision, flat. Compare it to a project stalled 2 to 5 months while your contractor’s price quietly goes up.
What if my HOA says no anyway?
We prepare your packet against your HOA’s actual governing documents, which prevents most denials. If the committee asks for changes, revisions and resubmission are included in the flat price — we stay on the case until there’s a decision.
Who actually prepares and files my documents?
A human permit specialist and drafter own your case. AI tooling drafts the paperwork fast; a person who knows your jurisdiction checks it, signs off, and files it. Nothing goes to your HOA or city unreviewed.
Do you cover my city and my HOA?
We’re launching in one metro and expanding by demand. When you sign up, your address tells us where to open next — founding users in each new metro get their first Approval Report free.
Stop guessing what the committee and the clerk want — get the full list for your project, free.
Founding users get early access and a free Approval Report for their address when we open their metro. No payment, no commitment.