Get help with your Charlotte HOA approval

A Charlotte deck or shed can need sign-off from your HOA and a permit from Mecklenburg County Code Enforcement, with zoning handled by the City of Charlotte. Tell us about your Charlotte project and we’ll follow up.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.

Charlotte and Mecklenburg permits for decks, sheds, fences, and ADUs

In Charlotte, building permits come from the county, not the city. Mecklenburg County Code Enforcement says one of its primary responsibilities is issuing building, electrical, plumbing, and mechanical permits under N.C.G.S. 160D-1110. For zoning questions — setbacks, fencing, and property use — the county points you to the planning and zoning office for Charlotte or for your town: Cornelius, Davidson, Huntersville, Mint Hill, Matthews, or Pineville. Your HOA is a separate track. The city’s zoning FAQ says restrictive covenants may be enforced by the homeowners association, the management company, or individual homeowners.

Mecklenburg County Code Enforcement — Permitting

  • Decks

    Mecklenburg County’s brochure of commonly asked residential questions answers “Yes” to whether a deck needs a permit. It says all decks, no matter the size, need to be inspected for footing size and depth, girder and joist spans, attachments, and railing requirements. Footings must be a minimum 12 inches below grade or until good soil is established.

    Source: Mecklenburg County Code Enforcement: Commonly Asked Residential Questions (brochure)

  • Sheds and accessory buildings

    Code Enforcement’s customer FAQ says a storage shed or accessory building needs a building permit if any dimension is greater than 12 feet. Below that, it doesn’t need a building permit, but it will need a zoning permit.

    Source: Mecklenburg County Code Enforcement: Customer Information & Resource Center

  • Fences

    In Charlotte’s Neighborhood 1, Neighborhood 2, and MHP zoning districts, UDO § 17.2.D.2 limits a fence or wall to five feet above grade in the front setback, six feet in the side setback, and eight feet in the rear setback. A fence placed within the public right-of-way needs certification or an encroachment agreement — from CDOT for city-maintained right-of-way, or NCDOT for state-maintained right-of-way.

    Source: Charlotte UDO Article 17: Accessory Structures

  • ADUs

    UDO § 15.6.F allows only one ADU per lot, alongside a single-family dwelling or a duplex whose units aren’t on sublots. The ADU and the main house must be under the same ownership, and it can’t have its own driveway unless the lot is a corner lot, a through lot, or abuts an alley. An ADU inside an accessory structure is capped at 600 heated square feet or 70% of the main home’s total floor area, whichever is greater — but never more than 1,000 heated square feet.

    Source: Charlotte UDO Article 15: Uses (§ 15.6.F, Accessory Dwelling Unit)

  • Solar

    The UDO’s solar panel standards in § 17.2.M state that they don’t apply to single-family, duplex, triplex, or quadraplex dwellings on individual lots.

    Source: Charlotte UDO Article 17: Accessory Structures (§ 17.2.M)

Review times (as of October 2026)

Code Enforcement’s residential plan review page states a goal of reviewing plans for one- and two-family dwellings within an average of seven days of plan acceptance, and townhouse projects within twelve days. The county notes these timeframes vary depending on the volume of submittals. The same page lists all new ADUs among the projects that need plan review (checked October 2026). Source: Mecklenburg County Code Enforcement: Residential Plan Review.

What North Carolina HOA law says about your Charlotte project

Charlotte HOAs in planned communities are generally covered by the North Carolina Planned Community Act, Chapter 47F of the General Statutes. Under § 47F-1-102, it applies to communities created on or after January 1, 1999, with exceptions for those of 20 or fewer lots (unless the declaration opts in) and for nonresidential ones. A few sections, including the hearing and flag rules below, also reach older communities unless their declaration or articles expressly provide otherwise. Solar protections are in a separate statute, N.C.G.S. § 22B-20.

  • Under N.C.G.S. § 22B-20, a covenant that would prohibit, or have the effect of prohibiting, a solar collector on a residential property is void and unenforceable. There are carve-outs: a covenant may still bar collectors visible from the ground on a facade facing common or public areas, on a roof slope facing those areas, or in the space between that facade and those areas. Condominiums in multi-story buildings with horizontal unit boundaries are excluded. Source: N.C.G.S. § 22B-20 (Solar collectors).
  • Before an HOA fines you, § 47F-3-107.1 generally calls for a hearing before the executive board or an adjudicatory panel of members, unless the declaration sets its own procedure. You must get notice of the charge, a chance to be heard and present evidence, and notice of the decision. A fine can’t exceed $100.00, though it may be charged for each day the violation occurs more than five days after the decision. A panel’s decision can be appealed to the full board within 15 days. Source: N.C.G.S. § 47F-3-107.1 (Procedures for fines and suspension).
  • Section 47F-3-121, as rewritten by Session Law 2026-59 (approved August 11, 2026, and effective when it became law), says no restriction on the use of land shall be construed to regulate or prohibit displaying a U.S. or North Carolina flag no larger than four feet by six feet, shown consistent with 4 U.S.C. §§ 5-10. The rewrite deleted the old exceptions for covenants that named the flag in specific wording. It covers property you own exclusively, not common areas, easements, or rights-of-way. Source: N.C. Session Law 2026-59 (S.B. 445), Section 4.(b).

Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.

Charlotte HOA and permit FAQ

Do I need a permit to build a deck in Charlotte?

Yes, according to Mecklenburg County Code Enforcement’s residential brochure. Every deck, whatever its size, is inspected for footings, spans, attachments, and railings, and footings go at least 12 inches below grade or until good soil is reached.

How tall can my fence be in Charlotte?

In Neighborhood 1, Neighborhood 2, and MHP districts, UDO § 17.2.D.2 allows five feet in the front setback, six in the side setback, and eight in the rear setback. Building in the public right-of-way takes a CDOT or NCDOT certification or encroachment agreement.

How big can a detached ADU be in Charlotte?

When the ADU is in an accessory structure, UDO § 15.6.F caps it at 600 heated square feet or 70% of the main home’s floor area, whichever is greater, with an absolute limit of 1,000 heated square feet. One ADU is allowed per lot.

Can a North Carolina HOA ban solar panels in Charlotte?

Generally not outright — N.C.G.S. § 22B-20 voids covenants that prohibit or effectively prohibit residential solar collectors. The statute still lets a covenant bar collectors visible from the ground on the side of the house facing common or public access areas.

Get help with your Charlotte project

Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.