Line up Cary town permits with HOA design review

Cary’s Inspections and Permits Department reviews decks, larger sheds, and rooftop solar, and the town’s ADU page notes that homeowners-association rules can still limit what the Land Development Ordinance allows. Tell us about your Cary project.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.

Cary permits for decks, fences, sheds, solar, and ADUs

The Town of Cary Inspections and Permits Department, in Town Hall at 316 North Academy Street, issues residential building permits under the North Carolina State Building Code. Apply through the town’s electronic plan review site. Planning and Development Services handles fence locations on thoroughfares and collector streets and Land Development Ordinance questions. The town’s ADU materials state that setbacks, HOA requirements, and the state building code can still limit an ADU the LDO otherwise allows.

Town of Cary — Residential Permits FAQ

  • Decks

    Cary’s residential FAQ lists all decks, regardless of size or height, among accessory structures that need a building permit, and points to the town’s Deck Design Assistant and Deck Guide. Whenever a deck changes a building’s footprint, a proposed plot plan and an as-built survey are required; an as-built survey is required if the work is within 5 feet of a setback, easement, or buffer. Replacing deck boards, pickets, railings, or treads is listed among work that does not need a permit.

    Source: Town of Cary — Residential Permits FAQ

  • Fences

    Most residential fences do not need a permit: they may be 8 feet or less and can go to the property line (not the back of the curb or sidewalk), and they are not allowed in sewer and utility easements, stormwater access easements, sight-distance easements, and some buffers. A fence permit is required for a new or substantially rebuilt fence taller than 42 inches and located within 30 feet of a thoroughfare or collector-street right-of-way. Those fences need evergreen shrubs averaging every 5 feet of frontage, at least 24 inches tall at planting. Pool-barrier fences are permitted with the pool building permit. The FAQ also lists fences as not requiring a building permit unless they are on a collector street or thoroughfare.

    Source: Town of Cary — Fence Rules

  • Sheds

    The FAQ requires a permit for sheds and enclosed buildings greater than 12 feet in any dimension, including tree houses. Residential accessory buildings that are no more than 12 feet in any dimension are listed as not requiring a permit. A gazebo needs a permit; a trellis or pergola with an open roof does not. At-grade patios do not need a permit if they stay at least 5 feet from property lines.

    Source: Town of Cary — Residential Permits FAQ

  • ADUs

    Town Council adopted ACT 32 on April 10, 2025, effective June 2, 2025. The adopted LDO amendment allows detached ADUs in all single-unit detached-dwelling residential districts, raises the maximum ADU size relative to the primary dwelling from 33% to 50% (the 800-square-foot maximum remains for detached ADUs and for additions that create an ADU), and requires one parking space per ADU regardless of bedroom count. The town’s housing page notes that setbacks, HOA rules, and the North Carolina building code can still apply. Cary’s alterations page describes ADUs as needing their own cooking, sleeping, and bathing facilities and a separate outside entrance.

    Source: Town of Cary — 2024–2026 ACT Items (ACT 32)

  • Solar

    The FAQ lists solar or photovoltaic equipment, including reinstalling equipment when a roof is replaced, as work that needs a permit. Inspections are required for electrical work and for building work on rooftop or structure-mounted systems, plus plumbing or mechanical work if those trades are involved. Plan-review staff list the required inspections on the permit documents.

    Source: Town of Cary — Residential Permits FAQ (solar PV)

Review times (as of October 2026)

Cary’s residential FAQ says remodeling, repairs, alterations, decks, porches, and many other projects can take the regular review cycle of approximately seven business days, or a scheduled SPOT review. Eligible SPOT projects include decks, porches, storage buildings, and additions less than 500 square feet, and interior alterations less than 1,500 square feet; the alterations page describes SPOT review as typically completed in 1–4 business days. Plan review for one- and two-family homes is described as normally taking one to two weeks (checked October 2026). Source: Town of Cary — Residential Permits FAQ.

North Carolina planned-community rules for Cary HOAs

Cary subdivisions organized as planned communities are generally governed by Chapter 47F of the North Carolina General Statutes, the Planned Community Act. Section 47F-1-102 applies it to communities created on or after January 1, 1999, with exceptions for those of 20 or fewer lots that have not opted in and for nonresidential communities. Several of the powers, budget, and lien rules below are in Article 3 of that chapter.

  • Unless the articles or declaration say otherwise, N.C.G.S. § 47F-3-102 lets the association adopt bylaws and rules, collect assessments, and, after notice and an opportunity to be heard, impose reasonable fines or suspend privileges or services (except access to lots) for declaration, bylaw, or rule violations. Late charges on unpaid assessments may not exceed the greater of $20.00 per month or 10% of any unpaid installment, and privileges may be suspended after assessments have been unpaid for 30 days or longer, again after notice and a chance to be heard. Source: N.C.G.S. § 47F-3-102 (Powers of owners’ association).
  • Section 47F-3-103 says officers and executive-board members must discharge their duties in good faith, meeting the nonprofit-corporation standards in G.S. 55A-8-42 and 55A-8-30. The board may not unilaterally amend the declaration, terminate the community, or set its own qualifications and terms, though it may fill vacancies for the rest of a term. Lot owners present and entitled to vote at a quorate meeting may remove a board member with or without cause, other than a declarant appointee. Within 30 days after adopting a proposed budget, the board must send a summary and notice of a ratification meeting to be held 10 to 60 days later; the budget is ratified unless a majority of all lot owners (or a larger vote in the declaration) rejects it, and no quorum is required at that meeting. Source: N.C.G.S. § 47F-3-103 (Executive board members and officers).
  • Under § 47F-3-116, an assessment unpaid for 30 days or longer becomes a lien on the lot when a claim of lien is filed with the clerk of superior court in the county where the lot sits. Once filed, the claim secures sums then due and sums that become due afterward. Unless the declaration provides otherwise, fees, charges, late charges, and other charges imposed under §§ 47F-3-102, 47F-3-107, 47F-3-107.1, and 47F-3-115 are included. Source: N.C.G.S. § 47F-3-116 (Lien for sums due the association).
  • Section 47F-3-120 limits court-awarded attorneys’ fees in a suit to enforce the articles, declaration, bylaws, or adopted rules: except as provided in § 47F-3-116, the court may award reasonable attorneys’ fees to the prevailing party only if recovery of those fees is allowed in the declaration. Source: N.C.G.S. § 47F-3-120 (Declaration limits on attorneys’ fees).

Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.

Cary HOA and permit FAQ

Does every deck need a permit in Cary?

Yes. The town’s residential FAQ lists all decks, regardless of size or height, as needing a building permit. Replacing boards, pickets, railings, or treads does not.

Do I need a permit for a Cary fence?

Usually not, if it is 8 feet or less and stays on your lot out of listed easements. A fence permit is required when a new or substantially rebuilt fence taller than 42 inches sits within 30 feet of a thoroughfare or collector-street right-of-way.

How large can a detached ADU be in Cary?

ACT 32, effective June 2, 2025, keeps an 800-square-foot maximum for detached ADUs and for additions that create an ADU, and allows the ADU to be up to 50% of the primary dwelling’s size. One parking space is required per ADU.

Can a Cary HOA fine me without a hearing?

N.C.G.S. § 47F-3-102 conditions reasonable fines and privilege suspensions on notice and an opportunity to be heard, unless the articles or declaration provide otherwise.

Get help with your Cary project

Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.