Help with Savannah HOA, historic, and building permits
In the City of Savannah, a porch, deck, or backyard building goes to Development Services through eTRAC — and any exterior work in a historic district also needs Historic Review Board approval.
City of Savannah permits for decks, fences, sheds, and solar
The City of Savannah’s Development Services department says its primary function is to permit and inspect new construction within the city limits. Building, trade, site, and plat permits are applied for online through eTRAC. Zoning questions, including business location approvals, are directed to Planning & Urban Design. Notes on the city’s residential permit lists add that all exterior work in historic districts must have Historic Review Board approval. An HOA’s design review, if you have one, is a different track from those city filings.
Decks and patios
Savannah’s list of residential projects that need a permit (revised December 10, 2021) includes “Build a porch, deck or patio,” which requires a building permit and plans. Enclosing an existing porch or enclosing a carport is listed the same way. A concrete patio on grade appears instead on the city’s list of residential projects that do not need a permit.
Source: City of Savannah: Residential Projects that Need a Permit
Accessory buildings
The same need-a-permit list requires a building permit and plans to “Build a new closed roof accessory structure over 120 ft².” Plot plans and site plans may be required for work involving setbacks, lot coverage, and locations in the Historic District.
Source: City of Savannah: Residential Projects that Need a Permit
Fences
A city bulletin revised June 11, 2026, says a fence permit is required to construct a wood or chain-link fence over 7 feet in height. Masonry and concrete fences, or any fence structure intended to have a footing, also need a fence permit. Fence heights are regulated by Zoning Ordinance Sec. 9.6. Historic Review Board approval is required for material changes to existing walls and fences and for new walls and fences in the Historic and Victorian Districts. Fences must sit entirely on private property; fences in easements may have to be removed at the owner’s cost. The city’s no-permit list separately says a wood or chain-link fence under 7 feet does not need a building permit.
Solar
The city’s solar roof installation checklist covers residential and commercial rooftop arrays of 25 kW or less mounted on the structure. A residential building-permit package includes a signed application and sealed “For Construction” plans. Trimming or removing trees for sunlight must go through the Park and Tree Department. If the project is in the Landmark Historic District, the Victorian District, or Mid-City / Cuyler-Brownsville Phase I, an additional design-review application is required; a Certificate of Appropriateness is required for exterior changes in historic district boundaries that are visible from the public right-of-way.
Source: City of Savannah: Solar Roof Installation Permit Submittal Information
Georgia HOA law for Savannah-area homeowners
Georgia’s Property Owners’ Association Act (O.C.G.A. § 44-3-220 et seq.) is opt-in. A 2020 amendment limits how a submitted association can change rental rules, and a 2026 law adds statewide owner rights to association records and meetings for registered associations.
- Under § 44-3-226(a), as revised by SB 442 (2020), an instrument under the Act is generally amended only by lot owners holding two-thirds of the association votes, or a larger majority the instrument specifies. While a declarant still owns at least one lot primarily for sale, no amendment that would more tightly restrict the declarant’s use or development of those lots may be made without the declarant’s written agreement. No amendment may prohibit or restrict a non-owner-occupied lot from continuing to be leased or rented for an initial term of six months or longer under the pre-amendment instrument; after a conveyance for value of $100 or more, that lot must conform to the amended instrument. Source: O.C.G.A. § 44-3-226(a), as amended by SB 442 (2020).
- Section 43-17A-7, added by SB 406 (2026), lists rights of owners in a registered association. Those include inspecting and obtaining copies of association records, accounting records (finalized balance sheet, budget, profit-and-loss, and bank statements for the past three years), and other records on written demand; receiving a copy of the association’s certificate of insurance on written demand; notice of member meetings in a fair and reasonable manner; attending member meetings, which the board must call at least annually; and access to common areas subject to the governing documents. Source: O.C.G.A. § 43-17A-7, as printed in SB 406 (2026).
- Section 43-17A-8, also added by SB 406, requires a registered association to apply an owner’s payments in this order: regular assessments or dues until current, then special assessments, then specific assessments, then other fees and fines. The association may not refuse to accept a payment in any amount for any assessment, and it may not assess or collect accelerated assessments. Source: O.C.G.A. § 43-17A-8, as printed in SB 406 (2026).
Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.
Savannah HOA and permit FAQ
Do I need a Savannah permit to build a deck?
Yes. The city’s residential need-a-permit list requires a building permit and plans to build a porch, deck, or patio. A concrete patio poured on grade is listed as not needing a permit.
When does Savannah require a fence permit?
A wood or chain-link fence over 7 feet needs a fence permit, and so does a masonry or concrete fence or any fence meant to have a footing. Wood and chain-link fences under 7 feet are on the city’s no-permit list. Historic and Victorian District fences also need Historic Review Board approval.
Does rooftop solar in Savannah need design review?
The solar checklist requires a building-permit package for rooftop arrays of 25 kW or less. In the Landmark Historic District, Victorian District, or Mid-City / Cuyler-Brownsville Phase I, an extra design-review application is required, and visible exterior changes in historic district boundaries need a Certificate of Appropriateness.
Can my Georgia HOA amend its covenants to stop me from renting?
For a community under the Property Owners’ Association Act, SB 442 says an amendment may not prohibit a non-owner-occupied lot from continuing to be leased for an initial term of six months or longer under the old instrument, until the lot is conveyed for value.
Get help with your Savannah project
Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.
Sources
Rules change. We link the official pages we used, checked October 2026. Confirm details with the office before you build.
- City of Savannah Development Services — Building Permits
- City of Savannah: Residential Projects that Need a Permit
- City of Savannah: Minimum Requirements for Fences
- City of Savannah: Solar Roof Installation Permit Submittal Information
- O.C.G.A. § 44-3-226(a), as amended by SB 442 (2020)
- O.C.G.A. § 43-17A-7, as printed in SB 406 (2026)