Help with Alpharetta HOA review and city permits
An Alpharetta mailing address is not enough: the city’s permitting portal says the work has to sit inside Alpharetta city limits, and a downtown carriage house has its own size cap in the Unified Development Code.
City of Alpharetta permits for home projects
The City of Alpharetta’s Community Development office, through Construction & Inspections, handles residential building construction. Apply and pay through the city’s Permitting Portal. The portal warns that a site can have an Alpharetta mailing address without being inside the city; if you are unsure, it points you to the city’s GIS map. Inspection requests for permitted work are called in to the Inspections Division the morning of the inspection. HOA architectural review, if your community has it, is not part of that city filing.
Building, trade, and tree permits
The city’s Permitting Portal is where you apply for building, trade, and tree permits and pay fees. Before you file, the portal asks you to confirm the site is inside the City of Alpharetta and, if you are not sure, to check the GIS mapping tool. It also tells applicants to accept email from cityworks.ga.us addresses and, if a registration email does not arrive within an hour, to write PermitTech@alpharetta.ga.us.
ADUs (downtown carriage houses)
In the Downtown Overlay, Alpharetta’s Unified Development Code treats a carriage house as a small self-contained accessory dwelling on the same lot as a detached house, semi-detached house, or townhouse, physically separated, with cooking, sanitation, and sleeping. The overlay allows one carriage house per lot. Dwelling floor area is capped at 700 square feet excluding the garage, and the unit may have at most one bedroom. A street-facing entrance is not required.
Source: Alpharetta UDC Appendix A, Downtown Overlay building types
Inspections
After a building construction permit is in play, the city’s Apply page says all inspection requests shall be called in to the Inspections Division at 678-297-6080 between 7:30 and 8:30 a.m. on the same day the inspection is desired.
Source: City of Alpharetta — Apply (building construction permits)
Georgia HOA law for Alpharetta-area homeowners
Georgia’s Property Owners’ Association Act is Article 6 of Chapter 3 of Title 44 (O.C.G.A. § 44-3-220 et seq.). It applies to a development whose declaration elects the article. Signed 2026 legislation rewrote how a development comes under the Act and how associations amend instruments and foreclose assessment liens.
- Section 44-3-222, as revised in SB 406 (2026), says a property owners’ development comes into existence when a declaration is recorded under the article, when a recorded declaration is amended under § 44-3-235(a)(2), or when an instrument is recorded under § 44-3-235(a)(3). Any declaration or amendment meant to bring a development under the article must state an affirmative election to be so governed. Source: O.C.G.A. § 44-3-222, as printed in SB 406 (2026).
- Section 44-3-226(b), as revised in the same act, says no instrument amendment may require approval of lot owners to which more than 80 percent of the association vote pertains (and mortgagees holding 80 percent of the voting interest of mortgaged lots). An association that existed before July 1, 1994, and submits to the article is deemed to have amended its instrument to that 80 percent ceiling, with a one-year window for associations submitting under § 44-3-235(a)(3) to vote to keep a higher threshold. Source: O.C.G.A. § 44-3-226(b), as printed in SB 406 (2026).
- Section 44-3-232(c), as revised in SB 406, requires at least 60 days’ certified or statutory-overnight notice before the association may sue to foreclose an assessment lien. The notice must state that paying the amount due before the sixtieth day after receipt will eliminate the foreclosure right. No foreclosure under that subsection is permitted unless the lien is at least the lesser of $4,000 or 12 months of regular assessments, and not less than $2,000, excluding specific assessments, fines, or fees from that calculation. The assessment lien lapses six years after the assessment or installment first became due. Source: O.C.G.A. § 44-3-232(c), as printed in SB 406 (2026).
Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.
Alpharetta HOA and permit FAQ
Does an Alpharetta mailing address mean the City of Alpharetta issues my permit?
Not necessarily. The city’s permitting portal says a site can have an Alpharetta mailing address without sitting inside the city limits, and it tells you to confirm the location with the city’s GIS map before you apply.
How large can a carriage house be in downtown Alpharetta?
In the Downtown Overlay, the Unified Development Code allows one carriage house per lot. Dwelling floor area is limited to 700 square feet excluding the garage, and the unit may have only one bedroom.
When do I call for an Alpharetta building inspection?
The city says inspection requests are called in to the Inspections Division at 678-297-6080 between 7:30 and 8:30 a.m. on the same day you want the inspection.
Can my Georgia HOA demand more than 80 percent to amend its declaration?
For a community under the Property Owners’ Association Act, § 44-3-226(b) as revised in 2026 generally bars requiring more than 80 percent of the association vote to amend the instrument, with a limited exception for some associations that submit under § 44-3-235(a)(3).
Get help with your Alpharetta project
Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.
Sources
Rules change. We link the official pages we used, checked October 2026. Confirm details with the office before you build.