HOA approval help for your Orlando home project

Orlando homeowners often need both an HOA architectural approval and a permit from the City of Orlando’s Permitting Services Division. For sheds and other accessory structures, the city’s own checklists ask for the HOA’s approval letter.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.

City of Orlando permits for common home projects

The City of Orlando’s Permitting Services Division handles residential and commercial permits. An Orlando mailing address doesn’t always mean city jurisdiction — the city’s ADU guide points owners to the Orlando Information Locator, where the Jurisdiction box should read “City of Orlando.” If it names another government, that office handles your permit; Orange County’s Division of Building Safety, for instance, issues building permits under the county’s own construction regulations. HOA approval runs on its own track, though the city may ask to see the HOA’s letter for some projects.

City of Orlando Permitting Services Division

  • Fences

    Not every Orlando fence needs a permit, but every fence must follow City Code. You generally need one if the fence is taller than six feet; built of concrete, masonry, or block; serves as a pool or spa barrier; sits on a corner lot or a lot with a rear alley; is near a public easement; has vehicular or powered gates; or is in a floodplain. Plastic and vinyl fences aren’t allowed in historic districts. The city also asks you to make sure your HOA has approved the fence, if you have one.

    Source: City of Orlando, Apply for a Fence Permit

  • Sheds, decks, and pergolas

    Orlando reviews sheds, pergolas, wooden patios, decks, and carports as accessory structures. Its plan review guide lists an HOA approval letter among the submittal items if the home is in a development with an HOA. A custom, field-built shed needs signed and sealed engineered drawings, and plans must account for the city’s 130 mph design wind speed.

    Source: City of Orlando Accessory Structure Plan Review Guide

  • ADUs

    Lots zoned R-1, R-2, R-3, MXD, O-1, O-2, or PD may be eligible for an ADU, depending on lot size. In R-1, for example, the city’s guide lists a 6,000-square-foot minimum lot for an ADU up to 500 square feet and 9,000 square feet for one up to 1,000. The ADU must be smaller than the main house, a detached unit can’t sit in front of it, and the same owner must hold both.

    Source: City of Orlando ADU Step-by-Step Guide

  • Solar

    For residential solar, Orlando’s checklist says only the trade application is required: an electrical permit for photovoltaic panels or a plumbing permit for solar thermal. Homes in a historic district or on a designated landmark property also need a Certificate of Appropriateness.

    Source: City of Orlando Solar Plan Review Checklist

  • Small projects under $7,500

    Since July 1, 2026, a state law (HB 803) lets single-family owners skip a building permit for qualifying work valued under $7,500 — but in Orlando you must first submit an exemption request to the city. Fences, pool barriers, roofing, elevated decks, other structural work, electrical, plumbing, mechanical, gas work, and any work in a flood hazard area don’t qualify, whatever the cost.

    Source: City of Orlando Residential Building Permit Exemption Guide

Review times (as of October 2026)

Orlando’s building permit guidelines say the city checks an application for completeness within 5 business days. For work on an existing single-family home valued under $15,000, it responds with approval or comments within 5 business days; a new single-family home under 7,500 square feet gets 30 business days. Applicants have 10 business days to answer rejection comments (checked October 2026). Source: City of Orlando Building Permit Guidelines.

Florida HOA law and your Orlando architectural review

Homeowners’ associations in Florida are governed by Chapter 720 of the Florida Statutes, with a few related rules elsewhere in state law. These sections limit what an Orlando HOA can demand or deny.

  • Under § 720.3035(1)(c), an HOA or its architectural committee may not require you to get a government building permit before it will review your plans. In Orlando, where the city may ask for the HOA’s letter, that generally means the HOA review can come first. Source: Fla. Stat. § 720.3035.
  • Section 163.04(2) bars covenants and declarations from prohibiting solar collectors. An association may still choose where on the roof panels go, within an orientation to the south or within 45° east or west of due south, so long as that choice doesn’t impair the system’s effective operation. Source: Fla. Stat. § 163.04.
  • Section 720.3075(4)(b) says HOA documents may not prohibit, or be enforced to prohibit, Florida-friendly landscaping. Section 373.185 defines that as quality landscapes that conserve water, protect the environment, adapt to local conditions, and tolerate drought. Source: Fla. Stat. § 720.3075.
  • Section 720.3075(3)(e) adds that HOA documents can’t stop you from hiring a contractor or worker simply because they aren’t on the association’s preferred vendor list. Source: Fla. Stat. § 720.3075.

Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.

Orlando HOA and permit FAQ

Do I need a permit for a fence in Orlando?

It depends on the fence. Orlando requires a permit for fences taller than six feet, masonry or block fences, pool or spa barriers, fences on corner lots or lots with a rear alley, fences near a public easement or in a floodplain, and fences with vehicular or powered gates. Every fence must meet City Code either way.

Will the City of Orlando ask for my HOA’s approval?

For sheds and other accessory structures, it can. The city’s accessory structure plan review guide lists an HOA approval letter if you live in a development with an HOA. Under Fla. Stat. § 720.3035(1)(c), the HOA can’t make you get the city permit before it reviews your plans.

Can I build an ADU on my Orlando lot?

Possibly, if your lot is zoned R-1, R-2, R-3, MXD, O-1, O-2, or PD and is large enough. The city’s guide also says the ADU must be smaller than the main house, a detached one can’t sit in front of it, and the same owner must hold both.

Does the $7,500 permit exemption cover a fence or deck in Orlando?

No. Orlando’s exemption guide lists fences, pool barriers, and elevated decks among the structural work that doesn’t qualify, whatever the cost. Eligible work still needs an exemption request to the city.

Get help with your Orlando project

Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.