Jacksonville HOA approval help for fences and sheds
A new fence, shed, or ADU in Jacksonville can need sign-off from your HOA’s architectural review and from the City of Jacksonville’s Building Inspection Division.
How Jacksonville handles residential permits
Jacksonville and Duval County share one consolidated government, and its Building Inspection Division enforces the Florida Building Code and the city’s building ordinances. The division now requires online submission for every permit type through JaxEPICS. Four communities inside the county run their own zoning and building departments: Atlantic Beach, Neptune Beach, Jacksonville Beach, and the Town of Baldwin. Approval from your HOA is a separate matter from the city’s permit.
Fences
According to the city’s zoning FAQ, a fence can be up to 4 feet tall within the front yard setback and up to 8 feet tall from that point toward the back of the lot. Corner lots must keep a visibility triangle clear. Going taller than these limits takes an administrative deviation.
Source: City of Jacksonville Zoning FAQs
Sheds
Jacksonville draws its line at 150 square feet. A shed that size or larger needs structural drawings signed and sealed by a Florida-licensed design professional, and any shed that is 150 square feet or more, or over $5,000, goes through plan review before the permit is issued. A shed job of $5,000 or more also needs a recorded Notice of Commencement. Sheds under 150 square feet often don’t need an inspection.
Detached garages and workshops
The zoning FAQ says an accessory structure can sit as close as 5 feet to the rear and side property lines and must be at least 5 feet from the house. It can be up to 15 feet tall and 900 square feet, and it counts toward the lot’s maximum coverage.
Source: City of Jacksonville Zoning FAQs
ADUs
Jacksonville’s zoning code requires an ADU to sit behind the main house, with a footprint no larger than 25% of the main house’s gross floor area or 750 square feet, whichever is less. The property must have a homestead exemption, or the owner must have applied for one. The permit application also asks whether you’re in a deed-restricted community or an HOA — and, if so, for confirmation that its rules allow an ADU.
Florida statutes behind Jacksonville HOA decisions
Chapter 720 of the Florida Statutes, the Homeowners’ Associations law, sets ground rules for architectural review across Duval County. For a Jacksonville homeowner, a few sections stand out.
- Every HOA must adopt hurricane protection specifications under § 720.3035(6), and it generally can’t deny an application that meets them. The statute’s list includes storm shutters, impact-resistant windows and doors, reinforced garage doors, and exterior fixed generators. Source: Fla. Stat. § 720.3035.
- When your declaration or HOA rules set no specific setback limits, § 720.3035(3) says the county or municipal setbacks apply, and the association may not enforce a setback inconsistent with them. Source: Fla. Stat. § 720.3035.
- Florida’s solar rights law, § 163.04, covers clotheslines as well as solar collectors: a deed restriction or covenant may not prohibit either. In any litigation under that section, the prevailing party is entitled to costs and reasonable attorney’s fees. Source: Fla. Stat. § 163.04.
- Under § 720.304(2)(b), you may put up a freestanding flagpole up to 20 feet high, as long as it doesn’t block sightlines at intersections or sit in an easement. It must still meet building codes, zoning setbacks, and the setback and location rules in your HOA documents. Source: Fla. Stat. § 720.304.
Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.
Jacksonville HOA and permit FAQ
How high can my fence be in Jacksonville?
Up to 4 feet within the front yard setback and up to 8 feet behind it, according to the city’s zoning FAQ. Corner lots must keep a visibility triangle clear, and taller fences need an administrative deviation.
When does a Jacksonville shed need plan review?
When it’s 150 square feet or larger or costs more than $5,000. Sheds of 150 square feet or more also need signed and sealed structural drawings, and jobs of $5,000 or more need a recorded Notice of Commencement.
Does Jacksonville check with my HOA before approving an ADU?
The application asks you to certify whether your property is in a deed-restricted community or an HOA and, if it is, that you’ve confirmed an ADU is allowed under those rules. The ADU must also sit behind the main house on homestead property.
Does a Jacksonville Beach address go through the City of Jacksonville?
No. The city’s zoning FAQ notes that Jacksonville Beach, Atlantic Beach, Neptune Beach, and the Town of Baldwin keep their own zoning and building departments.
Get help with your Jacksonville project
Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.
Sources
Rules change. We link the official pages we used, checked October 2026. Confirm details with the office before you build.