Help with Salt Lake City HOA and permit approvals

In Salt Lake City, a fence, shed, or ADU can need sign-off from your HOA and from Salt Lake City Building Services. Share your project and ZIP, and we’ll follow up.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.

Salt Lake City permits for fences, sheds, and ADUs

Salt Lake City Building Services issues building permits inside city limits. Homes in Magna, Kearns, Emigration Canyon, and other unincorporated Salt Lake County areas are served by the Greater Salt Lake Municipal Services District instead. For a new structure, an addition, or exterior work in a historic district, the city says your first stop is the Planning Counter. If you’re in an HOA, its architectural review is a separate approval.

Salt Lake City Building Services — Building Permit Applications

  • Fences

    Salt Lake City requires a building permit before any fence or wall is built, with a site plan showing its location and height. A fence between the front property line and the front of the house can be up to 4 feet; at or behind the home’s primary façade, up to 6 feet. Masonry or concrete walls, and fences over 7 feet where allowed, need construction plans with reinforcement and foundation details.

    Source: Salt Lake City Planning — Residential Fences, Walls and Hedges (updated October 17, 2024)

  • Sheds and garages

    In single- and two-family zones, an accessory building such as a shed must be set back at least as far as the house, at least 1 foot from side and rear lot lines, and can’t cover more than 50% of the area between the back of the house and the rear lot line. In the FR, R-1, R-2, and SR districts, height is capped at 17 feet with a pitched roof or 12 feet with a flat one. These zoning standards apply even when no building permit is needed.

    Source: Salt Lake City Planning — Accessory Buildings for Residential Zoning (updated October 28, 2025)

  • ADUs

    The Planning Division’s ADU Handbook says an ADU is allowed on any property in a zoning district where residential uses are permitted, one per lot, under city code section 21A.40.200. When the main home is a single-family dwelling, the owner or an owner’s family member must live in either the house or the ADU.

    Source: Salt Lake City Planning Division — ADU Handbook

  • Pre-approved ADU plans

    Building Services lists ADU floor plans that its building code staff have pre-approved, including a 650-square-foot one-bedroom, a 775-square-foot two-bedroom, and detached-garage conversions. A site review is still required before a permit is issued.

    Source: Salt Lake City Building Services — Accessory Dwelling Unit Standard Plans

Review times (as of October 2026)

Building Services’ FAQ (checked October 2026) says minor reviews such as fences and re-roofs go through a quick-turnaround queue and are completed within 1–3 business days. Plan reviews for a one- or two-family home are to be completed within 14 business days under Utah Code § 10-20-909, and resubmitted corrections are generally reviewed in 7–10 business days. Source: Salt Lake City Building Services — FAQ.

What Utah HOA law says about your Salt Lake City project

Utah’s Community Association Act, Utah Code Title 57, Chapter 8a, limits what an HOA’s declaration, rules, and design criteria can require of lot owners. Several of those limits touch common home projects directly.

  • Under Utah Code § 57-8a-701, only the declaration — not other HOA governing documents — can prohibit solar on a lot with a detached home, and adding a ban to the declaration takes a vote of at least 67% of owners’ voting interests. An HOA may still require roof panels to stay below the roofline or have frames and wiring colored like the roof, and may limit size or placement if that cuts production and raises installation cost by 5% or less. Source: Utah Code § 57-8a-701 (Utah Legislature).
  • Utah Code § 57-8a-231 bars an HOA from prohibiting water-wise landscaping on a detached home’s lot. The HOA can still require a site plan review first and set water-wise design rules, but except where needed for erosion control, it can’t make you keep lawn in an area less than eight feet wide. Source: Utah Code § 57-8a-231 (Utah Legislature).
  • Under § 57-8a-218(16), an HOA rule generally can’t prohibit you from building an internal accessory dwelling unit within your residential lot, unless it would violate a local land use ordinance or a building, health, or fire code. Source: Utah Code § 57-8a-218 (Utah Legislature).
  • Section 57-8a-218(13) protects a completed design-review application: a later rule can’t take away your right to proceed under the governing documents in effect when you submitted it. Source: Utah Code § 57-8a-218 (Utah Legislature).

Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.

Salt Lake City HOA and permit FAQ

Do I need a permit for a fence in Salt Lake City?

Yes. Salt Lake City requires a building permit before any fence or wall goes up. Fences between the front property line and the front of the house are limited to 4 feet; at or behind the primary façade, the limit is 6 feet.

How long does a Salt Lake City building permit review take?

Building Services says small jobs like fences and re-roofs are completed within 1–3 business days in its quick-turnaround queue. Plan reviews for a one- or two-family home are to be completed within 14 business days under Utah Code § 10-20-909.

Can my Utah HOA stop me from installing solar panels?

On a detached home, generally only through its declaration, and adding a solar ban to the declaration takes a 67% owner vote. Rules on size or placement are allowed when they cut production and raise installation cost by 5% or less.

Can my Utah HOA require me to keep a lawn?

It generally can’t prohibit water-wise landscaping on a detached home’s lot, and outside of erosion control it can’t require lawn in an area less than eight feet wide. It can still require a site plan review and set water-wise design rules.

Get help with your Salt Lake City project

Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.