Get help with your Sacramento HOA approval

A Sacramento deck, fence, solar array, or ADU can need two sign-offs: your HOA’s architectural committee and the City of Sacramento Building Division. Each one has its own rules and its own timeline.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.

Sacramento permits for fences, decks, sheds, solar, and ADUs

Inside city limits, residential building permits come from the Building Division of the City of Sacramento’s Community Development Department, and almost every application goes through its online Public Permit Portal. Homes in unincorporated Sacramento County work with the county’s Building Permits & Inspection Division instead. Your HOA’s architectural review is a separate approval on top of either one.

City of Sacramento Building Division

  • Fences

    Sacramento City Code § 17.620.110 allows a fence or wall up to 4 feet tall along the front and street-side property lines or inside those setbacks. A decorative open wrought-iron or tubular-steel fence can go up to 6 feet there, but chain link and woven wire aren’t allowed in those setbacks at all. In rear and interior side yards the limit is 6 feet — or 8 feet along a line that borders a school, park, alley, or other nonresidential use.

    Source: Sacramento City Code § 17.620.110

  • Decks and sheds

    The Building Division’s list of permit-exempt work includes a deck of 200 square feet or less that is no more than 30 inches above grade at any point, isn’t attached to the house, and doesn’t serve the required exit door. The same list exempts one-story detached accessory buildings up to 120 square feet and fences up to 7 feet tall, though all fencing is still subject to Planning Division approval under City Code Chapter 17.620. None of these exemptions apply in a design review or preservation district or on a historic landmark.

    Source: City of Sacramento, Required Building Permits

  • ADUs

    The city’s ADU Resource Center says owners pick one set of rules for the ADUs on their lot: Sacramento’s local ADU ordinance (City Code § 17.228.105(B)) or the state ADU standards. Under the local ordinance, a lot with a single-unit or multi-unit home can have two ADUs, and detached ADU floor area is capped at 1,200 square feet combined. Lots in the EA-2 or EA-3 overlay zones are limited to one ADU.

    Source: City of Sacramento ADU Resource Center, Step 1

  • Solar

    Licensed contractors can run residential rooftop solar through SolarAPP+, the automated plan review the city accepts for buildings with one or two homes and for ADUs. The permit itself is then requested on the city’s Public Permit Portal with the SolarAPP+ approval ID, the city’s solar application, and a SMUD interconnection letter. Projects that skip SolarAPP+ go through the city’s standard plan review instead.

    Source: City of Sacramento, Residential Solar

Review times (as of March 2026)

The Building Division’s published cycle times (form CDD-0294, revised March 4, 2026) set a first review of 5 working days for decks and patio covers, 10 for accessory structures and garage conversions, 15 for additions, and 20 for new homes. Residential solar, battery, and EV charger reviews are listed at 24 hours. Later review cycles are shorter, and the times assume a complete submittal. Source: City of Sacramento, Cycle Times for Building Plan Review (CDD-0294).

What California HOA law says about your Sacramento project

California’s rules for homeowners associations live mainly in the Davis-Stirling Common Interest Development Act, which begins at Civil Code § 4000. A few of its sections, together with Civil Code § 714 on solar, limit how an HOA can treat the upgrades Sacramento homeowners ask about most often.

  • Civil Code § 714 voids HOA rules that effectively prohibit or restrict solar, while still allowing reasonable restrictions. For a photovoltaic system, a restriction generally only counts as reasonable if it doesn’t add more than $1,000 to the system’s cost or cut its efficiency by more than 10% — or if it allows an alternative system of comparable cost and efficiency. Source: California Civil Code § 714.
  • Under Civil Code § 4735, an HOA rule is void if it bans low water-using plants or artificial turf. An association also generally can’t fine you for cutting back on watering while a drought emergency declared by the Governor or a local government is in effect. Source: California Civil Code § 4735.
  • Civil Code § 4745 bars HOA rules that effectively prohibit or unreasonably restrict an EV charger in your unit or designated parking space. The HOA has to answer in writing, and an application that isn’t denied in writing within 60 days is deemed approved, unless the delay comes from a reasonable request for more information. Source: California Civil Code § 4745.
  • If your HOA turns down a proposed change, Civil Code § 4765 requires the written decision to explain why and to describe how to ask the board to reconsider. You’re generally entitled to that reconsideration at an open board meeting. Source: California Civil Code § 4765.

Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.

Sacramento HOA and permit FAQ

Do I need a permit for a fence in Sacramento?

The Building Division doesn’t require a building permit for a fence up to 7 feet tall, but fencing is still subject to Planning Division approval under City Code Chapter 17.620. That chapter limits front-yard fences to 4 feet (6 feet for open wrought iron or tubular steel) and rear and interior side yard fences to 6 feet. The Planning Division can answer questions about a specific lot.

Does a deck or shed need a permit in Sacramento?

A detached deck of 200 square feet or less, no more than 30 inches above grade, that doesn’t serve the required exit door is exempt, and so is a one-story detached accessory building up to 120 square feet. Those exemptions don’t apply in design review or preservation districts or on historic landmarks. Anything larger goes through the Building Division.

Can my Sacramento HOA stop me from replacing my lawn with drought-tolerant plants?

Under California Civil Code § 4735, an HOA rule that bans low water-using plants or artificial turf is void. The HOA can still apply landscaping rules that fully conform with that section.

Can a California HOA ban solar panels?

Only within tight limits. Civil Code § 714 voids rules that effectively prohibit or restrict solar, and only reasonable restrictions are allowed — for photovoltaic panels, generally ones that add no more than $1,000 to the cost or cut efficiency by no more than 10%, or that allow a comparable alternative.

Get help with your Sacramento project

Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.