Reno HOA plans meet city permits at the OneNV portal

Development Services reviews building code through onenv.us. The city’s fence handout tells you to ask the HOA separately, and the ADU guide points to private restrictions in Title 18.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.

Reno permits for fences, sheds, patio covers, solar, and ADUs

The City of Reno Development Services Department accepts all building-permit applications electronically through the ONE Regional Licensing and Permitting portal at onenv.us. Residential fence-and-shed, patio-cover, garage, remodel, and new-construction permits are listed as plans-required work. The building-permits page points one- and two-family exemptions to IRC § R105.2, and it adopted the 2024 codes (with Northern Nevada Amendments) for plans accepted on or after January 1, 2026.

City of Reno Development Services — Building Permits

  • Fences

    Fence & Shed is a residential permit type that requires plans. The Residential Fence Permit Guidelines (updated July 1, 2025) ask for segment locations and lengths, height, material, gates, property lines, easements, adjacent street speed, and stop or yield signs. Post embedment, footing type, and size are required only if the fence is over 6 feet. The same sheet tells applicants to check the HOA for a separate approval, and to keep 36 inches of clearance at the back and sides of a fire hydrant and 8 feet above it.

    Source: City of Reno Development Services: Residential Fence Permit Guidelines (07/01/2025)

  • Sheds

    The same Building Permit Types list groups Fence & Shed as plans-required residential work. Applications go in through onenv.us with the other Development Services building permits; the department’s public exemption pointer is IRC § R105.2 rather than a separate shed handout.

    Source: City of Reno Development Services: Building Permit Types (06/01/2026)

  • Patio covers

    Patio Cover is its own plans-required residential permit type. Development Services publishes a Patio Cover Design Guide for covers attached to the house, with assumed seismic, wind, and snow criteria and a list of drawings (site plan, foundation plan, section, and roof framing) that may be used in lieu of custom drafted plans when the blanks are filled in.

    Source: City of Reno Development Services: Patio Cover Design Guide (07/01/2025)

  • Solar

    Solar Permit Guidelines (updated July 1, 2025) require electronic filing at onenv.us. Every set needs a CADD or line-drawn site plan (not a consumer map printout), electrical design, and structural engineering for anchorage and roof reinforcement. Ground-mounted arrays also need civil or structural design. Supporting documents include stamped structural calculations with a verification letter on the existing roof and manufacturer specifications. Framing details must show racking connections, including wall-framing connections for battery wall systems when those are part of the job.

    Source: City of Reno Development Services: Solar Permit Guidelines (07/01/2025)

  • ADUs

    Reno’s ADU guide (revised October 13, 2025) allows one attached or detached accessory dwelling on a lot of at least 5,000 square feet where single-family homes are allowed. Height cannot exceed the existing primary residence, both types must meet principal-structure setbacks, and one on-site parking space is required. ADUs must not conflict with private restrictions under Title 18 § 18.01.305. An attached ADU’s front door cannot face the same street as the main front door; in SF-3, the example size cap is 1,600 square feet or 50% of the principal structure, whichever is less. File the building permit at onenv.us after talking with Planning and Building.

    Source: City of Reno: Accessory Dwelling Unit (ADU) Guide and FAQs (revised 10/13/25)

Review times (as of June 1, 2026)

Development Services’ Building Permit Types sheet (updated June 1, 2026) lists residential permits that require plans — including Fence & Shed, Patio Cover, Garage & Carports, and Remodel & Addition — with a 10-day review. Source: City of Reno Development Services: Building Permit Types (06/01/2026).

NRS limits on Reno HOA sanctions, solar, and wind

Reno associations still answer to NRS Chapter 116 for their corporate powers. Separate NRS chapters void deed restrictions that shut down solar or, with narrower exceptions, wind energy systems — which matters in a city whose ADU code already defers to private restrictions.

  • NRS 116.3102 lists what a unit-owners’ association may do, including adopting rules, regulating common elements, and imposing reasonable fines — but fines are allowed only if the association follows NRS 116.31031. Construction penalties need separate authorization under NRS 116.310305. Those powers sit “subject to the provisions of the declaration,” so the statute both grants tools and ties them to the recorded documents and the rest of Chapter 116. Source: NRS 116.3102 (Powers of unit-owners’ association; limitations).
  • NRS 278.0208 bars a governing body from adopting an ordinance that prohibits or unreasonably restricts an owner’s use of a solar energy system, and it voids any deed covenant that does the same. A restriction that cuts the system’s efficiency or performance by more than 10%, without a comparable alternative, is deemed unreasonable, as is a ban on components painted with black solar glazing. Source: NRS 278.0208 (Prohibition against prohibiting or unreasonably restricting solar energy).
  • NRS 111.2395 voids a covenant that prohibits or unreasonably restricts a wind-energy system on the property. Reasonable height, noise, or safety rules, and FAA hazard determinations, may still apply. A restriction that significantly decreases the system’s efficiency or performance without a comparable alternative counts as unreasonable. Source: NRS 111.2395 (Restrictions on wind energy systems).

Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.

Reno HOA and permit FAQ

Do I need a permit for a fence in Reno?

Fence & Shed is a plans-required residential permit type. The fence guidelines ask for height, material, gates, and easements, and they require footing details only when the fence is over 6 feet. The same sheet tells you to check the HOA.

How long does Reno take to review a patio cover or shed?

The Building Permit Types sheet updated June 1, 2026, lists those plans-required residential permits with a 10-day review.

How many ADUs can I build in Reno?

One per lot, on lots of at least 5,000 square feet in single-family areas. Height cannot exceed the existing house, and the ADU cannot conflict with private restrictions under Title 18 § 18.01.305.

Can a Reno deed ban rooftop solar?

NRS 278.0208 makes a covenant that prohibits or unreasonably restricts a solar energy system void. Cutting performance by more than 10% without a comparable alternative is treated as unreasonable.

Get help with your Reno project

Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.