Help with Mount Pleasant HOA covenants and town permits

In the Town of Mount Pleasant, an apartment over the garage is an ADU reviewed through Building Inspections, and a small shed or a fence under 7 feet can skip the building permit — but PLAN still reviews the site plan.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.

Town of Mount Pleasant permits for ADUs, sheds, fences, and pools

The Town of Mount Pleasant Building Inspection Division enforces state-adopted building codes and town zoning ordinances. It reviews residential and commercial plans, including additions and renovations, and issues certificates of occupancy or completion. Applications go through the town’s OPAL portal at 100 Ann Edwards Lane. The Building Permits page says work whose valuation exceeds the amount set by the Building Official, or that needs a structural inspection, must have a building permit, with plans as PDFs in OPAL. The town does not offer expedited or express reviews; it published a 4–6 week plan-review lead time (checked October 2026). Covenants are not the town’s to enforce — the ADU handout tells you to contact your neighborhood association if they currently prohibit accessory dwellings.

Town of Mount Pleasant — Building Permits

  • ADUs

    The town allows accessory dwelling units in the RC-1, RC-2, RR, CC, CL, R-1, R-2, R-3, R-4, WG-W, and PD districts when the conditions in the planning handout (quoting § 156.110(A)(11)) are met. Before construction, a scaled site plan and a signed statement that no covenants prohibit an ADU are required. One ADU is allowed per lot. Conditioned floor area is limited to 850 square feet; a ground-level ADU attached to or inside a detached garage building may not push that building’s footprint or total conditioned floor area over 850 square feet. A detached ADU may not exceed 25 feet in height. Either the principal dwelling or the ADU must be owner-occupied as the owner’s primary residence, and ADU occupancy is limited to three persons. One private off-street parking space is required for the ADU. Approval is through a building permit filed with Building Inspections, which reviews zoning and building code.

    Source: Town of Mount Pleasant Planning Department: Accessory Dwelling Units

  • Sheds and small accessory structures

    The town’s building-permit FAQ lists one-story detached accessory structures used as storage sheds, playhouses, and similar uses that are less than 200 square feet (except storm shelters) among work that does not need a building permit. Where a building permit is not required, site-plan approval is still required by PLAN under Zoning Code § 156.50, and Engineering and Development Services still reviews drainage and tree protection when required.

    Source: Town of Mount Pleasant: Apply for Permits (Building Inspections FAQs)

  • Fences

    A fence under 7 feet tall is on the same exception list and does not need a building permit. Code Enforcement adds that the town does not allow fencing in a buffer, easement, or right-of-way, that fences on residential property in the Old Village Historic District are regulated, and that fences seven feet or higher may require a building permit. Even without a building permit, PLAN site-plan review under § 156.50 still applies.

    Source: Town of Mount Pleasant Code Enforcement (fence FAQ)

  • Trees with residential construction

    Tree removal tied to residential construction — including single-family homes, ADUs, additions, accessory structures, and pools — is reviewed through the building permit, not a standalone tree-removal permit. Removals not associated with construction still use the Tree Removal Permit application. On residential lots, trees 16 inches or greater in diameter at 4½ feet (with listed species exceptions) are protected, and pines 24 inches or larger are also protected.

    Source: Town of Mount Pleasant: Apply for Permits (tree and ADU FAQs)

Review times (as of October 2026)

The Building Permits page says plan review time fluctuates with workload and that plans are typically reviewed in the order received. It states the town’s current lead-time for plan review is 4–6 weeks, and that third-party plan review is offered only for new commercial construction when lead times are delayed — and was not available when the page was checked in October 2026. Source: Town of Mount Pleasant — Building Permits.

What South Carolina HOA law says about your Mount Pleasant project

South Carolina’s Homeowners Association Act (Title 27, Chapter 30, Article 1) defines who counts as an HOA and what its governing documents are. Article 3, separately titled, sets up Department of Consumer Affairs services and the definitions used for complaint intake.

  • Section 27-30-120 defines an HOA as an entity that manages a planned community or horizontal property regime whose declaration requires an owner, by virtue of owning a separate property there, to pay assessments for taxes, insurance, maintenance, improvements, or other expenses related to common elements. It excludes vacation time sharing plans under Chapter 32. “Governing documents” means the declaration, master deeds, or bylaws, including amendments. A “unit” is an apartment in a horizontal property regime or a lot in a subdivision. Source: S.C. Code § 27-30-120 (Title 27, Chapter 30).
  • Article 3’s short title, § 27-30-310, says that article must be known as the “Department of Consumer Affairs Services for Homeowners and Homeowners Associations Act.” Source: S.C. Code § 27-30-310 (Title 27, Chapter 30).
  • Section 27-30-320 supplies Article 3’s definitions, including “Department” as the Department of Consumer Affairs, and the same core HOA, homeowner, declaration, board, and unit terms used for the department’s complaint and reporting work. Source: S.C. Code § 27-30-320 (Title 27, Chapter 30).
  • Section 27-30-160 gives magistrates court concurrent jurisdiction to adjudicate monetary disputes arising under Article 1, so long as the dispute meets the jurisdictional requirements of S.C. Code § 22-3-10. Source: S.C. Code § 27-30-160 (Title 27, Chapter 30).

Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.

Mount Pleasant HOA and permit FAQ

Can I add an ADU in Mount Pleasant if my covenants forbid it?

The town requires a signed statement that no covenants prohibit construction of an ADU, and the planning handout tells you to contact your neighborhood association if they currently prohibit them. Where an ADU is allowed, conditioned floor area is capped at 850 square feet and occupancy at three persons.

Do I need a building permit for a small shed in Mount Pleasant?

A one-story detached storage shed or playhouse under 200 square feet (except a storm shelter) is listed as not needing a building permit, but PLAN still requires site-plan approval under § 156.50.

Do I need a permit for a fence under 7 feet in Mount Pleasant?

A building permit is not required for a fence under 7 feet. Fences are still barred from buffers, easements, and rights-of-way, Old Village Historic District fences are regulated, and PLAN site-plan review still applies.

How long does Mount Pleasant plan review take?

The town says plans are typically reviewed in the order received and that the current lead-time for plan review is 4–6 weeks (checked October 2026). It does not offer expedited or express reviews.

Get help with your Mount Pleasant project

Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.