Help with HOA review and city permits in Houston

In Houston, a project can need approval under your neighborhood’s deed restrictions or HOA rules and a permit from the Houston Permitting Center. Tell us what you’re building and we’ll follow up.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.

Houston permits for fences, decks, sheds, and garage apartments

Houston does not have zoning: the city’s Planning & Development Department says development is governed by ordinance codes on how property is subdivided, and those codes don’t address land use. Building permits come from the Houston Permitting Center, with applications filed online in iPermits. Private deed restrictions fill much of the gap. The Permitting Center tells homeowners to check their subdivision’s restrictions before starting work and warns that permits may be revoked for deed-restriction violations, and the City Legal Department takes complaints about violators. Approval from your HOA or civic club is a separate step from the city permit.

Houston Permitting Center — Plan Review (Residential)

  • Fences

    The Permitting Center’s residential fencing page says a fence of any material needs a permit once it is more than 8 feet above grade. A fence built wholly or partly of masonry or concrete needs a permit at any height. Fence permits also go through review by the Planning and Development Department.

    Source: Houston Permitting Center: Residential Fencing (HPWCODE1145)

  • Decks

    Houston’s list of permit-exempt residential work includes two kinds of decks. One is a deck of 200 square feet or less that is no more than 30 inches above grade at any point, isn’t attached to the house, and doesn’t serve the required exit door. The other is an uncovered deck no more than 30 inches above adjacent grade that isn’t over a basement or story below and isn’t part of an accessible route.

    Source: Houston Permitting Center: Plan Review — Residential exemptions

  • Sheds

    A one-story detached accessory structure with no more than 120 square feet of floor area doesn’t need a building permit, unless it’s a storm shelter. A new garage, carport, or storage building over 120 square feet needs a permit with plans, including a survey or site plan. The same guide says properties in a floodplain need Flood Plain Section approval on all projects.

    Source: Houston Permitting Center: One-Stop Shop, 2021 International Residential Code

  • Garage apartments (ADUs)

    Under the Livable Places amendments to Chapter 42, in effect since November 27, 2023, Houston raised the maximum size of a second dwelling unit — such as a garage apartment — from 900 to 1,500 square feet, with parking based on the unit’s size. The city says the new standards don’t override active deed restrictions, so a neighborhood’s restrictions can still rule out a second unit.

    Source: City of Houston Planning & Development: Livable Places amendments press release (Sept. 27, 2023)

  • Solar

    Houston’s solar guide (Form CE-1198, revised March 2024) tells applicants to verify deed restrictions on panel placement before applying. At minimum, a structural and an electrical permit are required, issued under the same project number, and a registered licensed electrician must buy the electrical permit. Plans go through electronic review, and a separate interconnection application goes to CenterPoint Energy before installation starts.

    Source: Houston Permitting Center: Solar Photovoltaic Panel Permit & Inspection Guide (CE-1198)

Texas HOA rules for Houston homeowners

Where a Houston neighborhood has a property owners’ association, the Texas Property Code applies. Chapter 202 governs how deed restrictions are construed and enforced and blocks certain restrictions outright. Chapter 209, the Texas Residential Property Owners Protection Act, adds procedural protections, but only for some associations.

  • Not every deed-restricted neighborhood is covered by chapter 209. Under § 209.003, it applies only to a residential subdivision whose declaration lets the association collect assessments on all or most of the property, and generally only where membership is mandatory for all or most owners. Condominiums are excluded. Source: Texas Property Code § 209.003 (Applicability of Chapter).
  • Section 202.019 generally bars an HOA from prohibiting a permanently installed standby generator — one that runs on natural gas, liquefied petroleum gas, diesel, biodiesel, or hydrogen, sits in a sound-reducing enclosure, and is rated at 7 kilowatts or more. The HOA can regulate its location and require screening in some cases, but a location rule is unenforceable if it adds more than 10% to the installation cost. If your plan meets the permitted rules, approval can’t be withheld. Source: Texas Property Code § 202.019 (Standby Electric Generators).
  • Solar is protected too. Section 202.010 voids most deed-restriction provisions that prohibit or restrict solar energy devices. An HOA may designate where roof panels go, but if another location would raise the system’s estimated annual production by more than 10%, using a National Renewable Energy Laboratory modeling tool, the owner can choose it. Source: Texas Property Code § 202.010 (Regulation of Solar Energy Devices).
  • When an architectural review authority says no, § 209.00505 lets you appeal to the HOA board. The written denial must describe the basis for it and tell you that you may request a hearing within 30 days. Only one hearing is required, and the board may affirm, modify, or reverse the decision. The rule generally reaches associations of more than 40 lots that the developer no longer controls. Source: Texas Property Code § 209.00505 (Architectural Review Authority).

Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.

Houston HOA and permit FAQ

Does Houston have zoning?

No. The city’s Planning & Development Department says Houston does not have zoning and its codes don’t address land use. Many neighborhoods rely on private deed restrictions instead, and the Houston Permitting Center warns that permits may be revoked for deed-restriction violations.

Do I need a permit for a fence in Houston?

Only if it’s over 8 feet above grade, or if it uses masonry or concrete, which needs a permit at any height. Your deed restrictions or HOA may still have their own fence rules.

Can I build a garage apartment in Houston?

Houston’s code allows a second dwelling unit of up to 1,500 square feet, with parking based on its size. Those city standards don’t override active deed restrictions, so check yours first.

Can my Texas HOA stop me from installing a standby generator?

Generally not. Texas Property Code § 202.019 bars HOA bans on qualifying permanently installed standby generators, though the association can regulate location and screening within the limits the statute sets.

Get help with your Houston project

Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.