Get your Denver renovation past the HOA and the city

For Denver homeowners planning a deck, fence, solar, or ADU — we prepare both approvals, file everything, and track it to approved.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.

Start with a free Approval Report for your Denver address.

The Denver skyline at sunset, seen across a park and lake, with the mountains behind it.

Two rulebooks. One project.

In Denver, a deck, fence, solar array, or ADU can need sign-off from two reviewers: the city’s building department and, if your home is in an HOA, its architectural committee. Each has its own forms, its own schedule, and its own reasons to send you back.

  • Your HOA and the building department each want their own paperwork, and neither one tells you what the other needs.
  • For most projects, Colorado law leaves HOA review timelines to each HOA’s own declaration and rules. Among Denver HOAs that publish their process, we’ve seen decisions promised anywhere from about two weeks to 45 days after a complete application.
  • In some planned communities, a master association and a local HOA both review your project, on their own schedules.
  • A missed committee meeting or one extra review cycle can push a spring project into summer.
  • Your contractor’s quote covers the build, not the site plan, elevation drawing, or material spec sheet your HOA and building department ask for.
  • As of June 2026, the City of Denver’s target for a first residential plan review is 2 business days for small projects like carports and pools, and 10 business days for additions and new homes. The city reports meeting its targets on 92% of reviews so far this year. Each round of corrections means another review. Source: Denver Community Planning and Development, June 2026.

Where we handle approvals

Denver. Share your email and ZIP with the form above, and we’ll follow up about your project.

One case. Both approvals. Flat price.

  1. Step 1 — Tell us your project.

    Enter your address, project type, and photos or your contractor’s quote. You get a free 2-page Approval Report listing everything your HOA and your city will require — including what would get you rejected.

  2. Step 2 — We prepare and file.

    A permit specialist, backed by AI tooling, writes your ARC packet, assembles the city permit application, and submits both.

  3. Step 3 — We handle revisions until it’s approved.

    When a reviewer comes back with comments, we translate them, fix the documents, and resubmit. You get a status ping at every stage.

Want a head start on the city side? Denver’s StartSmart guide shows which permits a home project needs.

Denver projects we handle

Whether you’re adding a deck, a fence, solar panels, or an ADU to your Denver home, the free Approval Report starts with your address.

  • Decks

    Your HOA reviews the look; your building department reviews the structure. We prepare both packets together, so neither one blindsides the other.

  • Fences

    Height, material, and placement can be governed by both your HOA’s design guidelines and your city’s zoning. We check both before anything goes in the ground.

  • Solar

    Your HOA may ask about panel placement and how the array looks from the street; the building department wants electrical and structural details. We package both.

  • ADUs

    An ADU touches zoning, building, and your HOA’s covenants at once. The Approval Report tells you what each one requires before you pay a designer.

Pricing

Approval Report

Free

Best for: homeowners still deciding if a project is worth the hassle.

  • 2-page report: every HOA and city requirement for your project
  • Gap list of what would get you rejected
  • Fee and timeline estimates for your jurisdiction

Contractor Plan

$799/mo

Best for: solar, roofing, pool, and deck contractors losing deals to the HOA black hole.

  • Up to 4 HOA/permit submissions per month
  • Status dashboard across all your client projects
  • Priority turnaround on revisions
  • Cancel any month

Denver FAQ

How do I get help with a Denver project?

Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.

What happens after I share my email?

We’ll follow up about your Denver project. No spam, and you can opt out anytime.

Do I need both an HOA approval and a permit?

Often both, sometimes one, occasionally neither. It depends on the project, your HOA’s governing documents, and the city’s rules. That’s exactly what the free Approval Report answers for your address.

Can I build an ADU on my lot?

It depends on your lot’s zoning, the city’s rules, and your HOA’s covenants. The Approval Report checks what each one requires before you spend money on design.

Find out what your Denver HOA and building department will ask for — free.

Tell us your email and ZIP code, and we’ll follow up about your Denver project. No payment, no commitment.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.