Get your Boise project through the HOA and the city

In Boise, a deck, shed, or ADU can need your HOA’s approval and a permit from the City of Boise’s Planning & Development Services. Tell us what you’re building, and we’ll follow up.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.

Boise permits for decks, fences, sheds, and ADUs

The City of Boise’s Planning & Development Services (PDS) issues building permits inside city limits, and its Planning division handles zoning questions such as setbacks. If your home is in unincorporated Ada County, Ada County Development Services issues the permit instead — the county’s building department issues permits only for property outside all city limits. An HOA’s design review, if you have one, is a separate approval.

City of Boise Planning & Development Services — Homeowner’s Guide

  • Decks

    Boise’s homeowner guide says a wood deck or concrete patio needs a building permit once it is more than 12 inches above grade. A small attached patio cover always needs one, because its weight transfers to the home’s exterior wall.

    Source: City of Boise — Homeowner’s Guide to Residential Construction

  • Fences

    The city’s “Who Do I Call” guide says residential fences don’t need a permit, except non-wood fences in historic districts. Fences are capped at 6 feet; in front of a house, the limit is 3 feet for a solid fence or 4 feet for an open-vision fence.

    Source: City of Boise — Who Do I Call at City Hall

  • Sheds

    A garden shed of 200 square feet or less doesn’t need a building permit unless it’s in a flood plain. For a shed between 120 and 200 square feet, the guide says to confirm your setbacks with the Planning division first.

    Source: City of Boise — Homeowner’s Guide to Residential Construction

  • ADUs

    Boise’s 2026 pre-approved ADU packet says ADUs are allowed as an accessory use to a single-family home in the R-1A, R-1B, R-1C, R-2, R-3, MX-1, MX-2, MX-3, MX-U, A-1, and A-2 zones. An ADU can be up to 70% of the home’s floor area or 900 square feet, whichever is smaller, and needs no extra parking space. The ADU gets a planning permit first, then a building permit.

    Source: City of Boise — Pre-Approved ADU Applicant Packet (2026)

  • Pre-approved ADU plans

    The city publishes public-domain, pre-approved ADU plan sets, from a 280-square-foot studio to a 695-square-foot two-bedroom, including two designs with a garage. The plans can’t be altered; changes need a separate permit after the ADU permit is finalized.

    Source: City of Boise — Pre-Approved ADU Plans

Review times (as of August 31, 2026)

For June 1 to August 31, 2026, Boise PDS reports an average first review of 1 business day for simpler (Level 1) residential additions, alterations, and repairs and 8 business days for mid-level (Level 2) ones, against a Level 2 target of under 10 days. First-review times count only the city’s time; including applicant resubmittals, those permits averaged 8 and 28 days to be ready to issue. Source: City of Boise PDS — Permit Processing Timeframes, June 1–August 31, 2026.

What Idaho HOA law says about your Boise project

Idaho’s Homeowner’s Association Act, Idaho Code Title 55, Chapter 32, sets statewide limits on HOA covenants for rooftop solar, flags, and accessory dwelling units, plus notice rules an HOA must follow before fining you.

  • Under Idaho Code § 55-3208, an HOA can’t add, amend, or enforce a covenant in a way that prohibits rooftop solar panels or collectors. It may choose where on the roof they go, as long as it allows a south-facing orientation (or within 45 degrees east or west of due south), and on roofs the homeowner owns and maintains it may require panels to sit parallel to the roofline. Source: Idaho Code § 55-3208 (Idaho Legislature).
  • Idaho Code § 55-3212 generally bars an HOA from adding, amending, or enforcing covenants that limit or prohibit ADUs, unless the affected owner agrees in writing. The HOA can still adopt reasonable rules on ADU design, size, height, setbacks, open space, parking, and bedrooms. Source: Idaho Code § 55-3212 (Idaho Legislature).
  • Section 55-3210 protects displaying the U.S. flag, the Idaho flag, the POW/MIA flag, and armed forces flags. An HOA can regulate flagpoles but must allow at least one per property — either up to 20 feet tall in the front yard or attached to your house. Source: Idaho Code § 55-3210 (Idaho Legislature).
  • Before an HOA can fine you for a covenant violation, § 55-3206 requires the fine authority to be in the covenants, a board majority vote, and at least 30 days’ written notice of the meeting. If you start resolving the violation before that meeting and keep at it in good faith, no fine can be imposed. Source: Idaho Code § 55-3206 (Idaho Legislature).

Your HOA’s own declaration, design guidelines, and architectural review process apply on top of these state rules and the city’s permit requirements.

Boise HOA and permit FAQ

Do I need a permit to build a deck in Boise?

Yes, if the deck is more than 12 inches above grade. Attached patio covers need a permit regardless. For questions, the city’s building line is (208) 608-7070.

Do I need a permit for a fence in Boise?

Most residential fences don’t, but non-wood fences in historic districts do. Fences are limited to 6 feet, and in front of a house to 3 feet if solid or 4 feet if open-vision.

Can my Idaho HOA stop me from building an ADU?

Generally, Idaho law bars an HOA from adding or enforcing covenants that limit or prohibit ADUs unless you agree in writing, though it can set reasonable rules on design, size, height, setbacks, and parking. On the city side, Boise allows an ADU with a single-family home in the zones listed above.

Can my Idaho HOA ban solar panels?

Not on your rooftop. Idaho law bars HOA covenants that prohibit rooftop solar, though the HOA can pick the roof location as long as a south-facing orientation is allowed.

Get help with your Boise project

Tell us your email and ZIP code. We’ll reach out to learn what you’re building and which HOA you’re in.

We use your email and ZIP to follow up about your project. No spam, and you can opt out anytime.